NEW QUESTION # 18
In a sprint planning, the product owner presents a user story written on a card. The team starts having a discussion with the product owner to get an understanding on how the software should work.
The user story written on the card is:
"As a customer, I want to subscribe to the mailing list so that I can receive the latest deal in an email." By applying the 3C concept, which ONE of the following statements is CORRECT?

  • A. The card should contain requirements not the user story.
  • B. Product owner has written a user story and confirmation is not needed.
  • C. Conversation should include the acceptance criteria discussion.
  • D. The conversation is not required and the team should start developing.

Answer: C


NEW QUESTION # 19
What is the definition of agile software development?

  • A. Testing carried out informally where no formal test preparation or execution takes place, no recognized test design technique is used and there are no expectations for results.
  • B. A group of software development methodologies based on iterative incremental development with self-organizing cross-functional teams who cooperate to define requirements and to implement the solution.
  • C. A way of developing software where the test cases are developed, and often automated, before the software under test is developed.
  • D. A framework to describe the software development lifecycle activities from requirements specification to maintenance where test planning of the various test levels is done as soon as the test basis is ready

Answer: B


NEW QUESTION # 20
Iteration planning for Sprint 5 of your current project is complete. The plan for the sprint is to increase performance of the system, which of the following acceptance criteria would you expect for Sprint 5?
1) User access for all roles has been validated.
2) A static analysis tool has been executed for all code.
3) 100% of the existing regression test suite has passed.
4) System is responding in less than 3 seconds, 90% of the time.
5) A new version of internet Explorer has been included.

  • A. 4, 5
  • B. 1, 3
  • C. 2, 5
  • D. 3, 4

Answer: D


NEW QUESTION # 21
You are a tester in an agile team. The user story you are due to test is still under development so your tests are blocked. The main issue holding progress on this user story is that the developer's unit tests are constantly failing.
As an agile tester, which of the following actions should you take?

  • A. Work together with the developer, suggesting reasons why the tests are failing.
  • B. Create a bug report for each of your blocked tests.
  • C. Use the time to improve and automate existing test cases of other user stories.
  • D. Review the design of the problematic user story and improve it where possible.

Answer: A


NEW QUESTION # 22
Which of the following statements about a test charter are CORRECT?
1) It is used mainly in exploratory tests.
2) It is used to monitor a test process.
3) It may make reference to user stories.
4) It contains notes taken during a test session.
5) It is used to outline the company test policy.

  • A. 2, 3, 4
  • B. 2, 4, 5
  • C. 1, 3, 4
  • D. 1, 2, 5

Answer: B


NEW QUESTION # 23
Which two of the following statements are CORRECT with regards to test automation on agile projects?
1) Every test developed for past iterations is kept and executed as part of a regression suite for each new release of code.
2) It would be very difficult to ensure high quality in an agile project without test automation.
3) Automated acceptance tests are run regularly as part of the continuous integration full system build.
4) Automated regression suites are only run for the final release of code.
5) In agile projects, the results from automated acceptance tests provide feedback on the overall product quality.

  • A. 3, 4
  • B. 1, 3
  • C. 2, 5
  • D. 2, 3

Answer: C


NEW QUESTION # 24
Which agile development approach incorporates the following practices:
* a project is divided into iterations called sprints
* each sprint results in a potentially releasable/shippable product?

  • A. Scrum
  • B. Extreme Programming
  • C. Kanban
  • D. Continuous Integration

Answer: A


NEW QUESTION # 25
Which of the following sentences about the integration of development and testing activities in Agile projects is INCORRECT?

  • A. Testers replace developers in writing unit test automation scripts.
  • B. While developers develop automated unit test scripts, testers write automated system level tests.
  • C. Developers and testers may work as a pair to develop and test a feature.
  • D. Developers write acceptance criteria and test cases, together with testers.

Answer: A


NEW QUESTION # 26
Which of the following activities are done in release planning?
1) Identifying testable user stories with acceptance criteria.
2) Elaborating the user stories into tasks.
3) Prioritizing the user stories.
4) Creating acceptance tests for the user stories.
5) Analyzing risks for each of the user stories.
6) Performing high level estimation for the release.

  • A. Activities 2, 3 and 5
  • B. Activities 1, 3 and 6
  • C. Activities 2 and 4
  • D. Activities 1, 4 and 6

Answer: B


NEW QUESTION # 27
You are developing the code that controls an industrial Espresso machine which will be operated by waiting staff in restaurants.
The machine is rather complicated and has lots of switches and buttons, so in the next iteration instructions will be provided to the operator on a small LCD screen.
A User Story for the Operator-Instructions module is as follows:
"As an operator of the Espresso machine, I would like to know how to steam milk, so I can add steamed milk to the coffee." The following is a list of risks identified for this story, with assigned probability and impact.

  • A. An untrained customer will attempt to use the coffee machine. Probability: High. Impact: High
  • B. Operators will not read the instructions and will try various switches and buttons until something works.
    Probability: Low. Impact: Low
  • C. The instructions may be incorrect or appear in the wrong order. Probability: Low. Impact: High
  • D. A small child may try to steam milk. Probability: High. Impact: Low

Answer: C


NEW QUESTION # 28
Which of the following is a risk that continuous integration introduces?

  • A. Teams no longer have the ability to run manual tests, as all tests must be automated.
  • B. Teams sometimes over-rely on unit tests and exclude some important system and acceptance tests.
  • C. Testers sometimes have too many builds to test, which reduces the quality of testing.
  • D. Developer's workload is increased, which can result in a reduction of output.

Answer: D


NEW QUESTION # 29
Your agile team is using the Testing Quadrants to ensure that all important test levels and test types are covered in the test plan.
In relation to Quadrant 3 - business facing and product critique, what should be considered for the plan?

  • A. Prototype Testing
  • B. Performance Testing
  • C. Functional Testing
  • D. Exploratory Testing

Answer: D


NEW QUESTION # 30
Which of the following is NOT a typical task performed by the tester within an Agile team?

  • A. Working with business stakeholders to clarify requirements.
  • B. Ensuring all project status meetings are held according to the plan.
  • C. Suggesting improvements in team retrospectives.
  • D. Ensuring the appropriate testing tasks are scheduled during iteration planning.

Answer: B


NEW QUESTION # 31
You have been asked to explain to your client how to define acceptance criteria that are fully testable. Which of the following is the BEST EXAMPLE for testable acceptance criteria?

  • A. The program's icon should be clear and attractive.
  • B. Action "Reopen" must be available only for a user with a specific authorization level.
  • C. The interface to External System shall be specified.
  • D. The "ID" field must accept input value of a length between 2 and 10 characters.

Answer: B


NEW QUESTION # 32
Which tasks are typically performed by a tester on an Agile project?
1) Implementing test strategy.
2) Documenting business requirements.
3) Measuring and reporting test coverage.
4) Coaching development team in relevant aspects of testing.
5) Executing test-driven development tests.

  • A. 1, 3
  • B. 2, 5
  • C. 2, 4, 5
  • D. 1, 3, 4

Answer: C


NEW QUESTION # 33
Which of the following is a benefit of a whole-team approach?

  • A. Enables the team to focus on solely their separate areas of expertise and responsibility.
  • B. Enables the various skill sets within the team to be leveraged to the benefit of the project.
  • C. Enables testers to execute their responsibility for quality for the combined team.
  • D. Enables reduction in test duplication as the testers and test engineers function as a single team.

Answer: B


NEW QUESTION # 34
......


The ISQI CTFL-AT (ISTQB Certified Tester - Foundation Level Extension - Agile Tester) Certification Exam is a globally recognized certification that focuses on testing in an agile environment. This certification is designed to test the knowledge and skills of testers in agile methodologies and practices. It is an extension of the ISTQB Foundation Level Certification and is ideal for professionals who want to enhance their testing skills in an agile environment.

 

Exam Questions Answers Braindumps CTFL-AT Exam Dumps PDF Questions: https://passleader.briandumpsprep.com/CTFL-AT-prep-exam-braindumps.html