
2023 Realistic Verified C-TS422-2020 exam dumps Q&As - C-TS422-2020 Free Update
Use Real C-TS422-2020 Dumps - 100% Free C-TS422-2020 Exam Dumps
SAP C_TS422_2020 certification exam is an associate-level exam that verifies that a candidate has the foundational knowledge and skills required to work with SAP S/4HANA production planning and manufacturing. C-TS422-2020 exam consists of 80 multiple-choice questions that must be completed within 180 minutes. C-TS422-2020 exam is available in English and can be taken at any SAP training and certification center or online via the SAP Learning Hub.
NEW QUESTION # 42
You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potential scrap of the high-value material?
- A. Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly.
- B. Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material.
- C. Enter the operation scrap and set the net indicator in the component of the bill of material of the assembly.
- D. Enter the component scrap in the material master of the assembly and set the net indicator in the routing operation where V Dthe component is used
Answer: D
NEW QUESTION # 43
For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.
- A. Production version
- B. Work center
- C. Plant
- D. Material
Answer: B,D
NEW QUESTION # 44
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Production orders are created with sales order reference.
- B. Sales order-specific stock is created
- C. Net requirements calculation is sales order-specific.
- D. Storage location MRP areas are required.
- E. Sales order-specific planning run is required.
Answer: A,B,C
NEW QUESTION # 45
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order's components are copied from the picking list.
- B. The planned order generates capacity requirements.
- C. The planned order's component availability is checked
- D. The planned order is converted to a production order.
Answer: B
NEW QUESTION # 46
Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question.
- A. Elimination of LIS tables for rebates
- B. Elimination of status tables
- C. Elimination of customer master tables
- D. Elimination of document index tables
- E. Elimination of output condition tables
Answer: B,C,D
NEW QUESTION # 47
Which of the following functions can be performed when the production order has the status "Created" (CRTD)? Please choose the correct answer.
- A. A user can trigger material staging via mass processing (transaction COHV).
- B. A user can schedule a background job to release production orders (transaction COOIS).
- C. A user trigger printing of shop floor paper manually (transaction CO02).
- D. A user trigger material availability check via mass processing (transaction COHV)
Answer: A
NEW QUESTION # 48
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A. Posting of production costs to the production cost collector
- B. Reduction of associated capacity requirements
- C. Material staging for next order in sequence
- D. Posting of goods receipt for the product
- E. Archiving of documents for assembly scrap
Answer: A,B,D
NEW QUESTION # 49
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
- A. Demand Planning (DP)
- B. Material Requirements Planning (MRP)
- C. Supply Network Planning (SNP)
- D. Capacity Requirements Planning (CRP)
Answer: B
NEW QUESTION # 50
What are the consequences if operation status Dispatched is set for a production order operation?
- A. You canreschedule the order using material requirements planning.
- B. You can reschedule the operation using lead the scheduling.
- C. You can reschedule the operation using finite Scheduling in a planning board.
- D. You can reschedule the order using lead time scheduling.
Answer: C
NEW QUESTION # 51
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.
- A. Purchase requisition
- B. Planned order
- C. Production order
- D. Scheduling agreement schedule line
- E. Stock transport order
Answer: A,B,D
NEW QUESTION # 52
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Material Requirements Planning (MRP)
- B. Integrated Business Planning (IBP)
- C. Capacity Requirements Planning (CRP)
- D. Supply Chain Management (SCM)
Answer: B,D
NEW QUESTION # 53
You want to schedule an order in the graphical planning board. What are valid planning directions?
There are 2 correct answers to this question.
- A. Squeezing in
- B. Forward with reverse
- C. Backwards
- D. Infinite sequencing
Answer: B,C
NEW QUESTION # 54
What are properties of MRP Live? There are 2 correct answers to this question.
- A. Data is read sequentially from the database tables
- B. It is executed on the database server
- C. The code is written in SQL Script
- D. It uses the same BAdis as classic MRP
Answer: B,C
NEW QUESTION # 55
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B. The assigned routing must NOT have alternative sequences.
- C. The assigned routing must be a rate routing.
- D. The lot size range must be within the lot-size range of the assigned routing.
- E. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
Answer: A,D,E
NEW QUESTION # 56
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. MRP Group
- B. MRP Profile
- C. MRP Controller
- D. Plant Data
Answer: A
NEW QUESTION # 57
When do you use variant bills of materials (BOMB)?
- A. When multiple material also have the same BOM
- B. When multiplematerial is have similar BOMB
- C. When a material has a configurable BOM
- D. When a material has multiple BOMB
Answer: A
NEW QUESTION # 58
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question.
- A. Scheduling margin key
- B. Operation control key
- C. Production scheduling profile
- D. Confirmation profile
Answer: B,C
NEW QUESTION # 59
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Picking list
- B. Kanban
- C. Transfer Order
- D. Backflushing
Answer: A
NEW QUESTION # 60
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.
- A. The number of leading zeros for internal numbers is client-specific.
- B. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
- C. In Customizing you can decide by material type whether to use the long material number.
- D. The display template for material numbers applies to all clients.
Answer: B,D
NEW QUESTION # 61
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.
- A. Only the OLAP system has the latest data
- B. The OLAP system needs to write back the data to the OLTP system
- C. Batch process are required to keep OLTP and OLAP in sync
- D. Only the OLAP system has a predefined subset of the data
- E. Multiple copies of the data exist
Answer: B,C,D,E
NEW QUESTION # 62
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To provide timely updates of inventory management for the staged components
- B. To determine the work in progress along the production line
- C. To reduce the totalproduction lead time for along production line
- D. To stage different components for a production line simultaneously
Answer: A,B
NEW QUESTION # 63
......
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (C_TS422_2020) exam is designed to test the knowledge and skills of professionals who are involved in the SAP S/4HANA Production Planning and Manufacturing module. C-TS422-2020 exam is intended for individuals who have a good understanding of the basics of production planning and manufacturing processes and the SAP S/4HANA system. The C_TS422_2020 exam is one of the most sought-after certifications in the field of production planning and manufacturing.
SAP C-TS422-2020 certification exam is designed for professionals who are involved in SAP S/4HANA Production Planning and Manufacturing. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing certification exam is meant to test the knowledge and skills of the candidates in the areas of production planning and execution, material requirements planning, capacity planning, and shop floor control. C-TS422-2020 exam also assesses the candidates' knowledge of the integration of SAP S/4HANA with other SAP modules and the ability to configure and customize the system to meet specific business requirements.
Pass C-TS422-2020 exam Updated 150 Questions: https://passleader.briandumpsprep.com/C-TS422-2020-prep-exam-braindumps.html
