Easy To Download HP HPE0-S59 Exam Dumps Updated 60 Questions [Q18-Q34]

Share

Easy To Download HP HPE0-S59 Exam Dumps Updated 60 Questions

New Updated HPE0-S59 Exam Questions 2023


To pass the HP HPE0-S59 exam, you must have a strong understanding of HPE compute solutions, including HPE ProLiant, HPE Synergy, and HPE Apollo systems. You must also have a good understanding of HPE server management tools, HPE server security, and HPE server virtualization technologies.


The HP HPE0-S59 exam consists of 60 multiple-choice questions that must be completed within 105 minutes. The exam covers a wide range of topics, including HPE compute solutions architecture, installation, configuration, management, and troubleshooting. The exam also covers topics such as virtualization, storage, networking, and security. To pass the exam, candidates must score at least 68%.


The exam covers a range of topics related to HPE Compute Solutions, including server architecture, virtualization, storage, security, and management. The exam questions are designed to test your understanding of these topics and your ability to apply them in real-world scenarios. It is important to have a strong understanding of these areas in order to pass the exam.

 

NEW QUESTION # 18
Refer to the exhibit.

Which statement about this logical JBOD is true?

  • A. After deleting this logical JBOD, its drives w not be available until a clean-up procedure 6 done
  • B. After deleting this logical JBOD drives will he blocked for 12h m case this JBOD must be re-created
  • C. This logical JBOD can be presented to the compute nodes in a different frame.
  • D. This logical JBOD can be connected to multiple systems to formulate a snared datastore.

Answer: A


NEW QUESTION # 19
Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer's needs?

  • A. One base chassis and three expansion chassis with licenses
  • B. At least Tour HPE Persistent Memory DIMMs per nPar
  • C. HPE Superdome Flex Grid licenses enabling connectivity between chassis
  • D. Rack Management Controller for nPar management

Answer: A


NEW QUESTION # 20
Your customer has an HPE Synergy frame equipped with a D3940 Storage Module. Each of the compute nodes has an appropriate storage controller Installed and two 12Gb SAS switches installed in the first fabric.
The customer reports that compute nodes cannot access the storage module. What should you verify first when troubleshooting this problem?

  • A. If there is at least one ISCSI network configured that will provide access to the module.
  • B. If the D3940 module is imported in managed state that allows volume provisioning.
  • C. If there Is a logical interconnect created based on the 12Gb SAS switches.
  • D. If the D3940 storage module is property licensed through HPE OneView interface.

Answer: B


NEW QUESTION # 21
An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement

Answer:

Explanation:


NEW QUESTION # 22
Your customer wants to add a second HPE Synergy frame to an existing logical enclosure Based on a single HPE Synergy frame. The customer wants to use a highly available master setup.
Which procedures should De performed during the expansion process? (Select two.)

  • A. Create a new logical interconnect group and enclosure group for two frames setup
  • B. Move one of the master modules to the appropriate interconnect bay in the second frame.
  • C. Create a new logical enclosure based on both HPE Synergy frames.
  • D. Re-parent an existing enclosure group to the new logical interconnect group.
  • E. Modify an existing logical interconnect to include second HPE Synergy frame.

Answer: C,E


NEW QUESTION # 23
Click the option that will allow you to change the ESXI image used In an OS Deployment Plan.

Answer:

Explanation:


NEW QUESTION # 24
What is a limitation when creating a server profile?

  • A. ILO management is limited to the integration with Active Directory or LDAP
  • B. It is not possible to create shared volumes on demand through a server profile
  • C. BIOS settings can be changed only when UEFI optimized is selected as boot mode
  • D. Administrator cannot define more than 8 connections within a server profile

Answer: A


NEW QUESTION # 25
Which statement about login redistribution is true?

  • A. Login redistribution is supported only on the HPE Synergy Virtual Connect SE 32Gb FC Modules
  • B. Login redistribution is a licensed feature and the number of licenses required depends on the number of active ports
  • C. Login redistribution is available only If HPE Primera or HPE Alletra is connected directly to the HPE Synergy frame
  • D. Login redistribution is used for login balancing when they are not distributed evenly over the FC links

Answer: A


NEW QUESTION # 26
What is a restriction of using a RoCE network?

  • A. it is not supported with HPE Virtual Connect SE 40 GD F8 Module for HPE Synergy.
  • B. It is by default configured as an untagged network and cannot be a part of a network set.
  • C. It does not support Private VLAN and Multicast VLAN.
  • D. It does not support smart link and private network features.

Answer: B


NEW QUESTION # 27
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster You are preparing a proposal with the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- an appropriate number of the vSphere Standard licenses for each compute node
- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options Which statement about this proposal is true?

  • A. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.
  • B. vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features
  • C. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
  • D. 2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup

Answer: B


NEW QUESTION # 28
Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter. The customer wants to use them to manage HPE Synergy Gen10 compute modules. HPE ProLiant Gen 10 servers and an MSA array.
Which statement about compatibility of the existing environment with the planned software components is true?

  • A. To use the required plugins HPE ProLiant Gen10 systems must be managed using HPE OneView
  • B. HPE OneView for VMware vCenter Server does not support standalone HPE ProLiant servers
  • C. HPE Storage integration Pack for VMware vCenter does not support MSA arrays
  • D. Both HPE Synergy Gen10 full-height compute module plugins will require a license

Answer: B


NEW QUESTION # 29
Your customer has me following HPE Synergy setup
- Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure
- Two HPE Virtual Connect SE 100Gb F32 Module for Synergy
- Four HPE Synergy 50Gb interconnect Link Module
- Six HPE Synergy Virtual Connect SE 32Gb FC Modules
The customer needs to add a frame.
Which statement about the expansion of this setup is true?

  • A. The customer can grow the existing logical enclosure up to 5 frames
  • B. The additional frame must have HPE Virtual Connect FC modules installed
  • C. The additional frame cannot have 12Gb SAS connection modules installed
  • D. The customer has to create a new logical enclosure for the additional frame

Answer: D


NEW QUESTION # 30
Match each HPE OneView network type with its definition.

Answer:

Explanation:


NEW QUESTION # 31
Click the area within the iLO management interface that will allow you to access workload Advisor.

Answer:

Explanation:


NEW QUESTION # 32
Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options - SAS connectivity installed in the first fabric - FC connectivity Installed In the second fabric - Ethernet connectivity installed in the third fabric.
Which statement regarding this setup is true?

  • A. Interconnect modules that provide SAS connectivity should be moved to the third fabric
  • B. Compute nodes must have a second CPU installed to access the second fabric.
  • C. Each compute node must have at least 768GB of memory installed
  • D. Each interconnect module in each fabric must be properly licensed in HPE OneView

Answer: C


NEW QUESTION # 33
Your customer plans to deploy VMware ESXi 7. 0 U2, and they are looking for a hardware platform that will allow them to use up to 16 CPU sockets Which HPE compute system meets the customer requirements?

  • A. HPE Superdome Flex system
  • B. HPE ProLiant OL380 Gen 10 Plus
  • C. HPE Synergy 480 Gen10 Plus
  • D. HPE ProLiant DL580 Gen10

Answer: C